1000W southeast asia electric motorcycle

Short Description:

Model: V8
Motor:  60V800W/1000W
Controller: 60V12tubes
Battery: 60V20AH
Overall Dim (mm): 1840*730*1130mm
Max Speed(km/h): 43km/h
Brake system: Disc/Drum(F/R)
Front and Wheel: 3.0-10tubeless
Charging time(H): 6-8h
Loading capacity(kg): 200kg
Max.Range per Charge: 70km
Container capacity(SKD): 78 pcs /40′HQ

Product Detail

Product Tags

Model: V8
Motor:  60V800W/1000W
Controller: 60V12tubes
Battery: 60V20AH
Overall Dim (mm): 1840*730*1130mm
Max Speed(km/h): 43km/h
Brake system: Disc/Drum(F/R)
Front and Wheel: 3.0-10tubeless
Charging time(H): 6-8h
Loading capacity(kg): 200kg
Max.Range per Charge: 70km
Container capacity(SKD): 78 pcs /40′HQ

detail picture

scooter

Hydraulic Shock Absorption, Comfortable Riding

Double damping hydraulic shock absorption, motorcycle racing technology. Stronger shock absorption, stronger rebound, and smooth road surface

Front Disc/ Rear Drum Brake System, Stable Braking

Shorten braking distance and improve braking sensitivity. Enhance the friction with the ground, and upgrade the safety performance

2 WHEEL ELECTRIC SCOOTER
ELECTRIC SCOOTER

Soft Cushion, Double Comfort

Highly resilient sponge, professionally thickened, makes people feel tired after sitting for a long time.

LCD Display, Clear Information At a Glance

Delicate graphic design, showing driving information in detail. It can still be seen in sunny and strong light

LED High Light Headlight

LED side reflective headlight, bright light source, clear vision at night, smooth riding on the whole road

 

The fashionable and atmospheric shape gives you a new riding experience

Size display

information at a glance

The dimensions are measured manually and are for reference only.please understand that there are maybe errors.

size
loading

Packing & Shipping 

Seven layer corrugated paper boxes or external corrugated paper internal iron frames are usually used for packaging during shipment. It can not only protect vehicles from collision, but also facilitate loading and unloading

We have a professional loading team to ensure safe and accurate packing and loading.Reasonably help you make plans for the product quantity and give scheme for your container loading.

微信图片_20190307115045
网站装箱

Tips:

  1. Poor quality charger is also easy to cause battery short circuit and burn the battery.

According to incomplete statistics, every year, 5% of users will catch fire or scrap their batteries due to improper charging, and most users use miscellaneous batteries rather than batteries with informal configuration. However, some users have to choose non brand chargers because they can't find suitable after-sales retail outlets. Therefore, it is suggested that when purchasing, we must choose brands with more retail outlets.

The conclusion is that the DC voltage output by the charger with good quality is very stable. Therefore, during the whole charging process of the battery, touching the battery surface with your hand will not feel hot, but will only have a warm feeling. During charging, the battery is hot, which may easily lead to the deformation of the electrode plate in the battery, the turbidity of the electrolyte, and finally the battery is damaged in a short time. The so-called damage is that the storage capacity of the battery is getting lower and lower, and even lead to battery explosion in serious cases. Therefore, it is recommended that you choose a high-quality battery charger, which ensures safety and is economical.

3
Are you a factory or trader?

Yes, we are a factory with more than 40 years history and also a trader. Very experienced.

Is sample first available? Do you have models in stock?

Sample first is available and we have some models in stock for you for quick shipment, please contact us for details.

What about warranty period?

We have different guarantee period for different components. please contact us for details.

What about payment terms?

We accept T/T,L/C, Alibaba trade assurance, cash

What the process to place an order? when to deliver?

Confirm the orders, pay the deposit. Arrange production (Common products without any change usually 15 to 20 days.). pay the balance, shipment.


  • Previous:
  • Next:

  • Connect

    Give Us A Shout
    Get Email Updates